• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, July 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Midas targets three copper resources within six months

    Midas targets three copper resources within six months

    Askari Metals to become Highland Metals in strategic rebrand

    Askari Metals to become Highland Metals in strategic rebrand

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada returns 14.72% Li₂O as Lithium Ridge expands to 9km

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Namibian companies take leading role in Etango construction

    Namibian companies take leading role in Etango construction

    Frontier targets maiden Engo uranium resource in third quarter

    Frontier targets maiden Engo uranium resource in third quarter

    Noronex targets new Namibia drilling campaign before year-end

    Noronex targets new Namibia drilling campaign before year-end

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Uncategorized

Northern Graphite strikes another deal for Okanjande with German Federal Ministry for Economic Affairs and Energy

by Editor
February 2, 2026
in Uncategorized
0
Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France
558
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Northern Graphite is banking on the restart of the Okanjande Project in Namibia to fulfil the demands of a N$34.5 million German-funded research and development programme.
This is the second deal Northern Graphite has signed after the US$200 million (about N$3.76 billion) agreement with Saudi Arabia’s Al Obeikan Group for Investment Company, announced last month, which provides for the development of a large-scale battery anode material plant in Yanbu Industrial City.
Canada-based Northern Graphite Corporation is participating in USE-G: Environmentally Friendly and Safe Graphite Extraction for Europe’s Battery Industry, a three-year initiative backed by the German Federal Ministry for Economic Affairs and Energy, which is contributing €1.14 million, or roughly N$23.1 million, toward a total project budget of €1.70 million (about N$34.5 million).
The programme brings together Northern Graphite, Rain Carbon Germany GmbH, H.C. Starck Tungsten GmbH, and Friedrich Schiller University Jena.
For Namibia, the strategic relevance lies in plans to supply natural graphite from a producing Canadian mine and, subject to restart, from Okanjande near Otjiwarongo, which has been on care and maintenance since 2018.
Long positioned as a battery-grade graphite asset, Okanjande’s inclusion in USE-G places it within a European-controlled processing, testing and recycling framework rather than a China-centric supply chain.
Graphite accounts for as much as 40% of the active material in a lithium-ion battery anode, yet Europe remains heavily dependent on China for purification, shaping and coating technologies. USE-G aims to change this by developing cleaner, less energy-intensive routes that avoid hydrofluoric acid, reduce energy use and incorporate recycled graphite recovered from spent batteries.
Under the programme, Northern Graphite will undertake milling, shaping and battery performance testing at its German laboratory.
In parallel, H.C. Starck Tungsten will apply proprietary technology to extract graphite from battery “black mass”, a material typically destroyed in conventional recycling processes.
Friedrich Schiller University Jena will lead research into chlorine-gas-based purification as a cleaner alternative to hydrofluoric acid and a less energy-intensive option than thermal purification.
Once purified, material will be processed by Rain Carbon Germany at its Duisburg and Castrop-Rauxel facilities, where advanced carbon coatings are developed for battery anodes.
Alongside the European programme, the Saudi agreement provides for a joint-venture anode plant, 51% owned by Al Obeikan and 49% by Northern Graphite. Construction is expected to begin in 2026, with first-phase production targeted for 2028 and an initial capacity of 25,000 tonnes per year, scalable as global demand grows.
The Saudi deal secures a long-term downstream outlet for Okanjande, with plans to offtake up to 50,000 tonnes per year of graphite concentrate once operations resume.
Together, the N$34.5 million German R&D programme and the N$3.76 billion Saudi downstream investment position Okanjande as a pivotal upstream asset linking Europe’s push for cleaner, independent battery materials with the Middle East’s ambition to build large-scale anode manufacturing capacity, sharpening the strategic case for restarting the Namibian project.

Share223Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Report backs Ongwe’s Omatjete project with C$8.5m exploration plan

Report backs Ongwe’s Omatjete project with C$8.5m exploration plan

July 29, 2026
Cazaly preps for detailed airborne survey over largest undrilled rare earth anomaly

Cazaly preps for detailed airborne survey over largest undrilled rare earth anomaly

July 29, 2026
Midas targets three copper resources within six months

Midas targets three copper resources within six months

July 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In