• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, June 11, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Elevate grows Marenica uranium resource from 40.2Mlb to 52.8Mlb

    Elevate grows Marenica uranium resource from 40.2Mlb to 52.8Mlb

    Shell strikes strongest oil results yet at Namibia’s Merlin-1X Well

    Shell strikes strongest oil results yet at Namibia’s Merlin-1X Well

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica to test 6 hydrocarbon zones across 420m at Kavango discovery

    Klein Aub Copper Mine

    Unicorn Mineral Resources to seal Klein Aub deal end of this month

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

    China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

    British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

    British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

    London-listed Arkle buys Namibia uranium stake for N$49m

    Arkle brings in London mining broker as Namibia uranium push gathers pace

    bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026

    bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Rosh Pinah gets N$164m for major solar park boost

by Editor
December 3, 2025
in Magazine
0
Rosh Pinah gets N$164m for major solar park boost
513
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Rosh Pinah is entering a new phase of industrial growth, and its energy needs are rising just as quickly.

This week, the Development Bank of Namibia (DBN) approved N$164 million to co-fund Phase Two of the Rosh Pinah Solar Park.

This renewable project is set to double its generation capacity and directly support the mine’s large-scale RP2.0 expansion.

The solar park, located just outside the town, was first developed to stabilise power supply for the Rosh Pinah Zinc Mine and reduce dependence on the national grid, which remains vulnerable to imports and price fluctuations.

Phase One, built in 2022 with N$58 million from DBN and private partners, delivered 5.4 MWp of generation capacity through a ground-mounted photovoltaic system designed to supply about 10 per cent of the mine’s daytime demand.

The plant uses single-axis tracking technology to maximise solar exposure and now feeds clean electricity directly into the mine’s internal power network.

Phase Two significantly scales up this infrastructure.

The new 11 MWp expansion will include additional tracker-mounted panels, upgraded inverters, expanded transmission lines and new control systems to integrate seamlessly into both the mine’s power reticulation and the RoshSkor Township distribution grid.

When completed, the combined 16.4 MWp facility will be one of the largest privately supported solar installations in Namibia, capable of supplying up to 30 per cent of the mine’s annual energy consumption and a similar share of power to town residents.

DBN Chief Executive Titus Ndove said the project reflects the bank’s commitment to financing transformative national infrastructure.

He said that by enabling clean and reliable power for industrial growth and community development, the bank is accelerating Namibia’s transition to sustainable energy while unlocking long-term economic value.

The solar park is also strategically important for reducing diesel back-up use and lowering carbon intensity at a time when mining companies are under pressure to meet global ESG expectations.

For Rosh Pinah Zinc Mine, renewable energy is not only a cost stabiliser but also a licensing and market advantage as zinc smelters and end users demand cleaner supply chains.

The need for expanded power is driven almost entirely by RP2.0, the mine’s major expansion programme now progressing steadily.

RP2.0 aims to nearly double ore throughput from 0.7 million to 1.3 million tonnes per year, positioning the mine as one of Namibia’s most efficient zinc producers.

Over the past year, engineering, design and environmental approvals have been completed, and procurement of key long-lead equipment is underway. Groundworks and civil preparations are progressing, and underground development is being intensified to ensure higher-grade ore will feed the expanded plant once production ramps up.

Contractors and construction teams are being mobilised for the 2025 build phase, supported by secured financing.

Expanded production is expected to begin in early to mid-2026, aligning with the solar park’s scheduled commissioning.

Together, the growth of RP2.0 and the doubling of renewable generation mark a new industrial chapter for the Kharas Region.

The synergy between the mine and the solar park is deliberate: the mine requires more power to unlock higher throughput, while the solar park ensures this growth is supported by cleaner, more reliable energy.

Rosh Pinah’s future, once dependent on a single ageing operation, is now increasingly shaped by strategic investment, modernisation and a transition toward sustainable production.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Bonya shifts southern Namibia beyond zinc into rare earths

Bonya shifts southern Namibia beyond zinc into rare earths

June 11, 2026
Askari uncovers major polymetallic system at Uis with tin grades hitting 4,050ppm

Askari uncovers major polymetallic system at Uis with tin grades hitting 4,050ppm

June 10, 2026
Elevate grows Marenica uranium resource from 40.2Mlb to 52.8Mlb

Elevate grows Marenica uranium resource from 40.2Mlb to 52.8Mlb

June 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In