• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, August 17, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx nears end of Haib infill drilling as resource update looms

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Policy

Namibia takes mining licence applications online

by Editor
November 28, 2023
in Policy
0
Tom Alweendo
653
SHARES
1.9k
VIEWS
Share on FacebookShare on Twitter

Applying for mining licences in Namibia will be online as of January 2024.
Mines minister Tom Alweendo told a press conference Monday that his ministry has reviewed the licensing system.
“You will not have to come to the Ministry of Mines and Energy to submit your application,” Alweendo said.
The minister also said his ministry would evaluate all the applications to eliminate backlogs because people would submit their applications daily.
Alweendo added that they have also implemented four submission window periods for licence applications per year.
Namibia, Alweendo reiterated, will not export critical raw minerals.
“Our policy stance is that we will not allow the exportation of these minerals without adding value to those minerals, and the Cabinet has decided in this respect,” he said.

Share261Tweet163
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kokoseb plans 130km desalinated water pipeline from Trekkopje

Kokoseb plans 130km desalinated water pipeline from Trekkopje

August 15, 2026
Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

August 15, 2026
Sprott’s Nam exposure set to reach US$432.5m

Sprott’s Nam exposure set to reach US$432.5m

August 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In