• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 5, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Kharas-1 brings Kudu revival closer than ever

by Editor
November 19, 2025
in Magazine
0
Kharas-1 brings Kudu revival closer than ever
526
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The Kharas is closer to giving Namibia long-awaited answers about the true potential of the Kudu gas fields than at any point in the last decade.

After months of drilling in deep Orange Basin waters, BW Energy has confirmed that the Kharas-1 appraisal well has reached total depth and intersected multiple formations across the Kudu licence, offering the clearest geological picture yet of what lies beneath Namibia’s southern offshore basin.

Kharas-1 was spudded in mid-September using the Deepsea Mira rig on Petroleum Production Licence (PPL) 003, the same block that hosts the historic Kudu gas discovery.

The Kudu field, first identified by Chevron in 1973, is one of Namibia’s oldest offshore discoveries. However, over the past 40 years the project has stalled repeatedly due to fluctuating domestic power demand, the high cost of deepwater development, and changing investment appetites among successive operators.

Previous partners—including Chevron, Energulf, Gazprom, and later Tullow—conducted extensive studies but ultimately stepped back after Kudu’s economics proved difficult under then-market conditions.

BW Energy entered the picture in 2021 after acquiring a 95% operating interest in the licence from Namcor. The national oil company retained 5%.

BW Energy brought a fresh approach: smaller-scale modular gas development anchored by a floating production unit and flexible gas-to-power options that could align more realistically with Namibia’s domestic electricity needs.

The company also committed to new subsurface evaluation, drilling, and reservoir modelling—investments that had been deferred for years. Kharas-1 is the first major physical result of that renewed investment programme.

Instead of aiming for a single, optimised target, BW Energy designed the well to cut through several intervals in a single borehole.

This approach sacrificed ideal well placement for individual zones but delivered a broader sweep of geological data—a crucial trade-off for a project that needs definitive clarity before Namibia can commit billions to any gas-to-power scheme.

The well was drilled through formations previously modelled but not comprehensively tested, allowing BW Energy to assess multiple reservoir targets in one operation.

The initial results, described by BW Energy as “encouraging,” show indications of hydrocarbons in several zones. Early analysis suggests the K1 interval may contain wetter hydrocarbons than the dry gas historically associated with Kudu, a detail that could influence decisions around production planning, processing design and overall commercial strategy.

While full test results and reservoir interpretations are still being processed, the company says the drilling has confirmed a working petroleum system and helped refine the geological architecture of the broader licence.

For Namibia, the significance goes beyond geology. Kudu has long been seen as a potential cornerstone for domestic power generation, capable of producing electricity at scale—especially for mining expansion and industrialisation.

Over the years, various development concepts were floated: a 700 MW integrated power station during the early 2000s, a reduced 444 MW project in the 2010s, and even multiple attempts to bring in external power utilities as anchor customers. None advanced far enough to justify investment.

BW Energy’s ownership structure and capital commitments have revived hope. The company brings both upstream experience and ties to BW Group, a global maritime and energy conglomerate with deep pockets and technical expertise.

To date, BW Energy has invested in seismic reprocessing, reservoir studies, drilling preparations and mobilisation of the Deepsea Mira rig—incremental steps that demonstrate both appetite and capacity to test Kudu’s viability rather than simply hold the licence.

Kharas-1 marks the first substantial step in years toward clarifying whether Kudu can be revived as a reliable domestic gas source.

BW Energy has already signalled that more appraisal drilling will be required. Each interval encountered at Kharas-1 will need targeted wells to unlock a clearer picture of commerciality and production behaviour.

But the early signs have provided enough confidence to push the project into a new phase: refining the reservoir model, updating development options and reassessing the role the field could play in Namibia’s future energy mix.

If the next round of drilling confirms what Kharas-1 has begun to show, Namibia could be looking at a more flexible, modular gas development than previously imagined—one capable of supporting baseload power while complementing the country’s rapid growth in renewables and the emergence of green hydrogen projects.

Kharas-1 has delivered what Kudu has lacked for decades: fresh data, renewed momentum and a clearer line of sight into a field long discussed but rarely understood with this level of detail.

The Kharas is not the final answer, but it is closer than Namibia has ever been to unlocking the next chapter of its domestic gas story.

Share210Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

May 5, 2026
Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

Namibia says 51% free-carry mine ownership not policy

May 4, 2026
Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

May 4, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In