• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 5, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

TotalEnergies ESIA report outlines plan for 40 wells at Venus

by Editor
November 3, 2025
in Magazine
0
TotalEnergies ESIA report outlines plan for 40 wells at Venus
568
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Namibia’s long-awaited Venus oil development is taking shape, with up to 40 subsea wells planned under a proposal detailed in the Environmental and Social Impact Assessment (ESIA) report released on 3 November 2025.

The report, prepared by SLR Environmental Consulting Namibia for TotalEnergies EP Namibia (TEEPNA) and its joint venture partners Impact Oil and Gas, NAMCOR, and Qatar Energy, marks a significant step toward transforming the 2022 discovery into the country’s first deepwater production field.

According to the report, the project will include 20 oil production wells and 20 gas injection wells, drilled 300 kilometres offshore from Oranjemund in water depths of about 3,000 metres.

Extracted hydrocarbons will be processed on a Floating Production, Storage and Offloading (FPSO) vessel, which will separate oil, gas, and water before the oil is transferred to shuttle tankers for export via a nearshore transhipment zone, 20 kilometres north of Walvis Bay.

The ESIA outlines that Venus could produce for at least 21 years, with a possible extension of a decade depending on reservoir performance. Gas will largely be reinjected into the reservoir to maintain pressure, while a portion will power the FPSO.

Support operations, including logistics, port services, and aviation, will be coordinated from Lüderitz and Walvis Bay, creating new employment and infrastructure opportunities in Namibia’s coastal regions.

Environmental studies within the ESIA indicate that the project area lies within the Benguela Current Large Marine Ecosystem, a biologically productive zone that supports rich fisheries and marine life.

However, the site sits mostly outside marine protected areas, with only limited overlap with low-intensity pelagic longline fisheries and ecological support zones.

The 21-year development plan also includes a decommissioning phase, during which the FPSO will be disconnected, subsea equipment will be dismantled or safely abandoned, and the area will be rehabilitated in accordance with international standards.

Public participation on the draft ESIA is open until 3 December 2025, with submissions invited via SLR’s registration portal or email at ESIAVenusOffshoreDev@udanam.com.

Share227Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

Namibia says 51% free-carry mine ownership not policy

May 4, 2026
Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

May 4, 2026
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In