• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, August 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Tantalite Valley waiting for exploitation

by Editor
November 3, 2025
in Magazine
0
Tantalite Valley waiting for exploitation
566
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

The earliest mention of Tantalite Valley appears in Namibia’s Department of Mines reports from the mid-1950s, describing a cluster of pegmatite-hosted tantalite and columbite deposits south of Warmbad, near the Orange River.

The name was coined informally by South African and German prospectors who worked the rugged hills of the Gamkab River tributaries, where black-speckled tantalite crystals were first identified.

The term “Tantalite Valley” soon became a convenient field name, distinguishing the area from nearby tin-bearing regions such as Aussenkehr and Karasburg.

By the late 1950s, small artisanal miners were carting ore across the border into South Africa for processing, establishing one of southern Africa’s earliest sources of tantalum.

Geology and mineralisation

The Tantalite Valley deposit lies within the Namaqualand Metamorphic Complex in southern Namibia’s Karas Region, about 30 kilometres south of Warmbad. The project area covers Mining Licence 77, including the farms Umeis 110 and Kinderzitt 132, and hosts a series of lithium–caesium–tantalum (LCT) pegmatites.

These pegmatites occur as gently dipping, east-west-striking intrusions up to 450 metres long and 45–180 metres wide, emplaced within granitic gneiss.

Mineralisation consists of disseminated tantalite, columbite, microlite, cassiterite, and accessory lithium minerals such as spodumene and lepidolite. Grades recorded from historic exploration range between 0.015 and 0.04 per cent Ta₂O₅, with elevated niobium and tin values.

The mineralised zones remain open at depth and along strike, suggesting strong potential for further resource expansion.

Ownership and modern development

Formal rights over the deposit were first issued in February 2001, when Mining Licence 77 was granted to consolidate the area’s workings.

After several smaller operators assessed the property, Kazera Global plc, then Kennedy Ventures plc, acquired a 75 per cent interest in 2014 through its Namibian subsidiary, African Tantalum (Pty) Ltd (Aftan), for £0.66 million.

The company increased its ownership to 100 per cent in 2015, marking the start of modern redevelopment.

Kazera re-established open-pit operations and constructed a concentrator designed to recover tantalum concentrate through gravity and magnetic separation. Between 2016 and 2021, the company carried out mapping, trenching, and processing trials, confirming consistent recoveries and commercial viability.

Export and production

In July 2022, Kazera completed plant commissioning and announced readiness for its first commercial export of tantalum concentrate, signalling Namibia’s re-entry into the global tantalum supply chain.

Production from Tantalite Valley, however, has historically been intermittent and small-scale. During the 1950s to 1970s, artisanal miners extracted hand-sorted ore and shipped small parcels of tantalite concentrate across the border to South Africa.

Between 2001 and 2013, the project was largely dormant, with minor trenching and sampling. Under Kazera’s early ownership from 2014 to 2018, pilot-scale mining and processing were conducted to test plant performance.

Following commissioning in 2022, small parcels of concentrate were produced and exported, with additional processing of stockpiled ore continuing to the present.

The mine remains listed by the Ministry of Mines and Energy as an active tantalum producer. However, output remains modest—likely measured in tens rather than hundreds of tonnes per year.

The HeBei deal and arbitration

Kazera’s next step was an ambitious sale agreement with HeBei Xinjian Construction CC, a Chinese resource development company. Signed in December 2022, the deal was valued at US$13 million, plus a 2.5 per cent gross sales royalty.

When HeBei failed to meet its payment obligations, the transaction collapsed. Arbitration in May 2025 awarded US$11.9 million in damages to Kazera following the buyer’s default.

Strategic role and current status

Today, the Tantalite Valley Mine remains owned by Kazera Global plc through African Tantalum (Pty) Ltd. Operations continue at a small scale, focused on processing and exploration within ML 77, which remains in good standing.

The valley’s pegmatites, rich in tantalum, niobium, tin, and lithium, form part of Namibia’s southern critical-minerals corridor alongside Arcadia Minerals’ Swanson Project farther north.

The mine employs residents of Warmbad and supports ancillary services in the Karas Region, contributing to Namibia’s growing role as a supplier of technology metals to the electronics, aerospace, and energy transition industries.

Seven decades after its discovery, Tantalite Valley still lives up to the name given by those early prospectors — a valley of rare minerals, quietly feeding a global appetite for the metals that power the modern world.

Share226Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

August 20, 2026
Amutse says Namibia must be ready onshore before first oil flows offshore

Amutse says Namibia must be ready onshore before first oil flows offshore

August 19, 2026
Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

August 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In