• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, August 16, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx nears end of Haib infill drilling as resource update looms

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Elevate Uranium’s groundbreaking pilot plant expected in Namibia early November

by Editor
October 29, 2025
in News
0
Elevate Uranium’s groundbreaking pilot plant expected in Namibia early November
528
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium’s U-grade™ Pilot Plant — the first facility of its kind ever to be deployed in Namibia — is on its way to the Erongo Region after being designed, constructed, and successfully tested in Perth, Australia.

The plant marks a new era for the country’s uranium sector, as it will allow Elevate to demonstrate the economic and environmental advantages of its proprietary U-grade™ beneficiation technology once installed and commissioned in November.

The innovative pilot facility is designed to operate continuously at a scalable level, confirming that the U-grade™ process can effectively remove gangue waste material and concentrate uranium mineralisation into a low-mass, high-grade feed before leaching.

This approach has the potential to reduce operating costs, energy use, and water consumption — key advantages for uranium operations in Namibia’s arid environment.

Technically, the U-grade™ Pilot Plant is a small-scale, continuous processing system that applies Elevate’s proprietary beneficiation method to upgrade run-of-mine uranium ore before chemical leaching.

In practice, it separates and removes gangue (waste) minerals such as quartz and feldspar — which typically make up 80–90% of ore mass — to produce a much smaller, higher-grade uranium concentrate.

This concentration step means far less material needs to be leached, reducing acid consumption by up to 75%, lowering processing costs, and improving environmental performance.

The plant’s purpose is to validate these results under real operating conditions using Namibian ore before scaling up to commercial production.

All on-site infrastructure and pre-installation logistics have been completed to prepare for the plant’s arrival. The company’s senior metallurgist, Andrew Jones, has already relocated from Perth to Namibia to oversee assembly, commissioning, and operations.

Once operational, the plant will process a minimum of 60 tonnes of uranium-bearing material, generating valuable data to support commercialisation.

Elevate Uranium’s U-grade™ technology represents a core part of its plan to advance its Namibian portfolio — including the Koppies, Namib IV, and Marenica uranium projects — which are strategically positioned in the world-class Erongo uranium province.

The pilot’s success will be critical in demonstrating the process’s scalability and confirming its ability to de-risk and enhance project economics across the company’s regional assets.

Chief Executive Officer Murray Hill has previously described the U-grade™ process as “a step-change technology that could redefine uranium beneficiation economics by lowering acid consumption and improving efficiency.”

The deployment of this first-ever processing plant in Namibia comes at a time of renewed global demand for nuclear fuel and underscores the country’s growing reputation as a technological and investment frontier in clean-energy minerals.

If successful, Elevate’s pilot plant will not only bolster its own project pipeline but also help position Namibia as a hub for advanced uranium-processing innovation on the African continent.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kokoseb plans 130km desalinated water pipeline from Trekkopje

Kokoseb plans 130km desalinated water pipeline from Trekkopje

August 15, 2026
Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

August 15, 2026
Sprott’s Nam exposure set to reach US$432.5m

Sprott’s Nam exposure set to reach US$432.5m

August 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In