• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 5, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx records another set of strong assay results at Haib project

by Editor
October 29, 2025
in Copper
0
Koryx records another set of strong assay results at Haib project
500
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper Inc. has reported another set of strong assay results from its ongoing drilling campaign at the Haib Copper Project in southern Namibia, reinforcing confidence in one of the world’s oldest and largest undeveloped porphyry copper systems.

The company announced results from 17 additional diamond drill holes totalling 5,556 metres, part of its Phase 2 and 3 exploration and development drilling designed to refine the mineral resource estimate (MRE) and advance Haib toward a potential development decision. The results confirm broad, consistent copper and molybdenum mineralisation across all four of Haib’s key target areas, with several intercepts exceeding the average resource grade.

Among the standout results were hole HM96, which returned 40 metres at 0.37% Cu from 4 to 44 metres and 116 metres at 0.36% Cu from 228 to 344 metres; HM76, which intersected 50 metres at 0.33% Cu from 102 to 152 metres; HM79, which returned 96 metres at 0.31% Cu from 74 to 170 metres; HM81, with 12 metres at 0.49% Cu from 182 to 194 metres; HM83, which intersected 34 metres at 0.35% Cu from 10 to 44 metres; HM86, with 30 metres at 0.33% Cu from 68 to 98 metres and 92 metres at 0.32% Cu from 252 to 344 metres; and HM91, with 52 metres at 0.36% Cu from 18 to 70 metres and 46 metres at 0.34% Cu from 126 to 172 metres.

The latest results, according to President and CEO Heye Daun, represent a good spread of locations across the entire mineralised system and continue to confirm the geological model for Haib. “Encouragingly, the holes continue to yield consistently positive results and support the mineral resource at Haib,” Daun said.

Koryx’s geological team has now completed a full relogging of the available core, refining the deposit’s lithological and structural interpretation. This updated model incorporates copper, molybdenum, and gold distribution data and is expected to underpin an updated Mineral Resource Estimate (MRE) to be released before the end of 2025.

The ongoing drilling continues to delineate copper zones ranging between 0.3% and 0.6% Cu, with some higher-grade intervals suggesting structural and lithological controls that could yield localised enrichment. These results are particularly promising for defining potential starter pits and enhancing the project’s early economics.

Haib’s exploration momentum is also set to accelerate. Four additional man-portable rigs have arrived in Namibia and are en route to site, which will bring the total to eight rigs focused on resource drilling and two on geotechnical drilling by October 2025.

Drilling across the four target zones continues to refine the mineralisation envelope. At Target 1, results confirmed shallow-dipping mineralisation near the Volstruis River, with consistent copper values though limited extension northwards due to faulting. Target 2 drilling returned strong near-surface grades, including 8 metres at 0.64% Cu, confirming lateral continuity. Target 3 results refined the mineralisation boundary and improved structural understanding of copper-bearing porphyritic andesites. Target 4 confirmed deeper extensions and highlighted molybdenum enrichment zones, with up to 2,000 ppm Mo reported in places.

The Haib Copper Project, located in Namibia’s //Karas Region near the Orange River, is envisaged as a large-scale copper producer with a potential dual processing route producing copper concentrate via conventional crushing, milling, and flotation, and potentially recovering additional copper through heap leaching.

Koryx is targeting a resource update by late 2025, which will incorporate the new drilling data and revised geological interpretations. The update is expected to build upon the August 2024 MRE, which already positioned Haib as a globally significant porphyry system with scale and grade comparable to early-stage South American copper deposits.

With fieldwork intensifying and multiple rigs on site, Koryx aims to complete the geological and geotechnical datasets required to progress Haib toward a prefeasibility-level study in 2026—a key step in advancing Namibia’s oldest copper deposit into a new generation of production.

Share200Tweet125
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

Namibia says 51% free-carry mine ownership not policy

May 4, 2026
Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

May 4, 2026
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In