• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, June 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Green Hydrogen

Namibia’s hydrogen dream flickers as Mnyupe’s exit exposes leadership void

by Editor
October 13, 2025
in Green Hydrogen
0
How many green jobs for Namibia – 600 000, 26 000 or 15 000?
632
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

Namibia’s green hydrogen dream now faces its greatest test — the departure of James Mnyupe, the man who became its brain, heart, and global face.
When he leaves, it will expose what many insiders have quietly feared: that the project has always depended more on individuals than institutions.
Under former President Hage Geingob, green hydrogen was not just a government programme; it was a personal mission.
Geingob championed it as the signature of his presidency, often speaking about it with warmth, conviction, and optimism. He hugged the project — literally and politically.
By appointing Mnyupe as both his economic adviser and the country’s first Green Hydrogen Commissioner, Geingob ensured the initiative had energy, coherence, and credibility.
Mnyupe travelled widely, negotiated tirelessly, and explained complex ideas with clarity.
Together, the two men gave the world confidence that Namibia could build a clean-energy industry from desert sun and Atlantic wind.
That unity of purpose is now gone. Since Geingob’s passing, the project has drifted into bureaucratic quiet. The current administration talks about hydrogen but does not live it.
There is little of the same enthusiasm, understanding, or technical drive that once came from the State House. No senior leader has stepped forward with Mnyupe’s fluency in policy, finance, and global climate diplomacy.
The “Namibia” that once spoke with confidence at world energy summits has gone silent, replaced by cautious, fragmented voices.
It is also fair to say that the current leadership bench has not yet demonstrated the depth of technical know-how or project-management muscle that Geingob and Mnyupe brought as a duo. That does not mean the administration opposes hydrogen; instead, it has not owned it.
Without Mnyupe’s coordination and Geingob’s protection, the programme risks losing its national anchor. Under Geingob, hydrogen had the state’s full weight behind it. Every ministry, agency, and partner knew who to call and what the president wanted.
Today, that clear line of authority has faded. What remains are private developers — like Hyphen, Cleanergy, and Daures — pursuing their own projects, but without the same level of state direction or cohesion. The government, once an active partner, now stands more on the sidelines than in the arena.
This is dangerous for a young industry that still needs nurturing. Hydrogen is complex; it requires skills in engineering, finance, regulation, and diplomacy, areas in which Namibia is still developing.
Mnyupe filled that gap — not only as a project manager but as a teacher to the system. With him gone, and with no one of similar depth waiting in line, the state risks losing both knowledge and momentum.
It would also be dishonest to ignore the quieter social undercurrent that surrounded Mnyupe.
Namibians are not a xenophobic people, but in his case, there was a silent, subtle aversion — a sense that the most visible face of Namibia’s future was somehow “not from here.”
It was never loud, never public, but it whispered through corridors and meetings.
Some questioned his loyalty, others his authority to speak for the nation. Yet it was Mnyupe who stood on the world’s stages selling Namibia’s vision, while many who criticised him could not explain the basics of hydrogen chemistry or project finance.
That quiet bias diminished the recognition he deserved, and now, with him gone, the irony is painful — the very nation that hesitated to own him fully will now struggle to replace him.
Individual projects might continue, especially those backed by foreign investors. But the vision of a coordinated national hydrogen economy — one that Geingob and Mnyupe sold to the world as “Namibia’s gift to the planet” — could die a quiet death.
The world will not wait while Namibia reorganises itself. Investors will move to countries that speak with confidence, not hesitation.
When Hage Geingob was alive, Namibia’s hydrogen future felt alive too — guided by belief, energy, and purpose.
With Mnyupe stepping away, that light is flickering.

Unless new leaders step up with the same curiosity, technical understanding, and public courage, the country’s once-celebrated hydrogen dream could fade into another unfinished chapter of good intentions and lost opportunities.

Share253Tweet158
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
MUN embarks on nationwide engagement with workers

MUN embarks on nationwide engagement with workers

June 21, 2026
Wia drills 9m at 10.64 g/t gold 350m below Kokoseb pit shell

Kokoseb owners pursue Omaruru groundwater, and Orano desalinated water

June 21, 2026
Cazaly secures access to Cadix Farm, clears path to maiden drilling at Abenab

Cazaly secures access to Cadix Farm, clears path to maiden drilling at Abenab

June 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In