• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Paladin raises equity to back Langer Heinrich’s 2026 ramp-up

by Editor
September 16, 2025
in Uranium
0
Namibia maintains top three position in global uranium production
524
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Paladin Energy Ltd has launched a fully underwritten A$300 million equity raising to provide general working capital while ramping up the Langer Heinrich Mine into full mining and processing plant operations by FY2027.

Exploration programs scheduled for FY2026 are expected to extend mine life, optimise production, and take advantage of buoyant uranium market conditions.

While most of the proceeds are earmarked for advancing the Patterson Lake South project towards a final investment decision, part of the funds will support infill and exploration drilling at both Patterson Lake and Namibia’s Langer Heinrich Mine.

The Langer Heinrich Mine has been central to Paladin’s rebound as a producer since restarting in 2024, and the equity raising underpins its transition from restart into steady-state growth.

Paladin said the mine remains on track to complete ramp-up by the end of FY2026, with full mining and processing plant operations planned for FY2027.

The Langer Heinrich Mine, situated in the Namib Desert approximately 80km east of Walvis Bay, has been Paladin’s flagship Namibian asset since its opening in 2007.

It was placed on care and maintenance in 2018 during a period of depressed uranium prices before being restarted in 2024 on the back of improved market demand.

Since the restart, Langer Heinrich Mine has become one of the few large-scale conventional uranium operations in Namibia, supplying utilities in Europe and Asia.

The raising includes an A$231 million institutional placement on the ASX, a C$30 million bought deal in Canada (about A$33 million), and a further A$36 million Treasury Share Sale tied to the company’s 2024 acquisition of Fission Uranium Corp.

Eligible shareholders in Australia and New Zealand will also be invited to take part in a share purchase plan of up to A$20 million at A$7.25 per share.

Paladin managing director and CEO Paul Hemburrow said the raising gave the company the flexibility to advance Canadian development while securing Namibian production.

“Today’s equity raising will allow Paladin to swiftly progress our strategy for delivering long-term value from our asset portfolio to shareholders.

“The funds secured give us balance sheet flexibility to advance the Patterson Lake South Project through to FID while simultaneously completing the ramp-up of operations at the Langer Heinrich Mine.

“Langer Heinrich is a cornerstone asset for Paladin and for Namibia. We are investing not just to bring it back into production, but to ensure it has the drilling, mine life extensions and processing capacity needed to deliver stable supply to global markets for years to come.

“With both Langer Heinrich and Patterson Lake advancing, Paladin is well positioned to capitalise on the strengthening uranium price environment and play a central role in the nuclear energy expansion that is underway globally,” he said.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

April 29, 2026
Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

April 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In