• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, May 9, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

    Northern Graphite begins relocating plant for Okanjande restart late 2027

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Wolfhag rescues Otjikoto Gold Mine once again

... pushes production to 44 940 ounces of gold in 3rd quarter

by Editor
November 9, 2023
in Gold
0
Wolfhag rescues Otjikoto Gold Mine once again
588
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

B2Gold says the Otjikoto Mine in Namibia produced 44,940 ounces of gold, mainly due to improved processed high-grade ore mined from the Wolfshag underground mine.
The Otjikoto Mine is expected to produce between 190,000 and 210,000 ounces of gold in 2023.
The Canadian company says that for the third quarter of 2023, mill feed grade at Otjikoto was 1.66 g/t, mill throughput was 0.86 million tonnes, and gold recovery averaged 98.4%.
“Production from the Wolfshag underground mine remained consistent during the third quarter of 2023, averaging over 1,259 tonnes per day at an average grade of 5.55 g/t,” B2Gold says in its third quarter 2023 results.
As of the beginning of 2023, B2Gold says, the Probable Mineral Reserve estimate for the Wolfshag deposit includes 203,000 ounces of gold in 1.1 million tonnes of ore at an average grade of 5.55 g/t gold.
The open pit mining operations at the Otjikoto Mine are scheduled to ramp down in 2024 and conclude in 2025 while processing operations will continue until 2031 when economically viable stockpiles are forecast to be exhausted.
Underground operations, however, are projected to continue until 2026, potentially extending operations if the ongoing exploration program successfully identifies more underground mineral deposits.
B2Gold spent US$13m, consisting of US$9m for deferred stripping in the Otjikoto pit and US$3m for Wolfshag underground mine development.
The cash operating costs were US$785 per gold ounce produced and US$744 per ounce of gold sold.
B2Gold says cash operating costs per ounce produced for the third quarter of 2023 were lower than expected due to higher production and a weaker Namibian dollar.
“For the first nine months of 2023, Otjikoto’s cash operating costs per ounce and all-in sustaining costs per ounce were below expectations due to a weaker Namibia dollar,” the company says.
B2Gold expects Otjikoto’s cash operating costs per ounce for 2023 to be between US$545 and US$605 per ounce (original guidance range of between US$590 and US$650 per ounce) and all-in sustaining costs to be between US$950 and US$1,010 per ounce (original guidance range of between US$1,080 and US$1,140 per ounce).
B2Gold holds a 90% interest in Otjikoto Gold Mine.

Share235Tweet147
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

Northern Graphite begins relocating plant for Okanjande restart late 2027

May 7, 2026
Otjikoto delivers N$13 billion revenue as 2025 gold output nears 200,000 ounces

Otjikoto’s Q1 2026 revenue rises to N$2.9 billion despite sharp drop in gold output

May 7, 2026
Kameelburg drilling confirms rare earth, strontium and niobium system

Aldoro hits 0.76% niobium over 11m, 2.94% REE at 74m at Kameelburg

May 7, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In