• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, May 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx Copper closes off N$343m funding to fast-track Haib Copper Project

by Editor
August 1, 2025
in Copper
0
Koryx Copper closes off N$343m funding to fast-track Haib Copper Project
512
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper Inc. has closed off a combined C$25 million financing round, equivalent to approximately N$343 million, to fast-track the development of its Haib Copper Project in southern Namibia.

The capital was raised through a bought-deal public offering and a concurrent private placement, providing fresh momentum to advance technical studies and optimise the project’s development pathway.

The company completed a public offering of 19,047,680 common shares at C$1.05 per share, generating gross proceeds of C$20,000,064.

This was complemented by a non-brokered private placement of 4,761,844 shares at the same price, raising an additional C$5 million.

At the current exchange rate of N$13.73 to the Canadian dollar, the combined proceeds translate to around N$343 million.

Stifel Canada led the offering as sole bookrunner, supported by a syndicate of underwriters that included Beacon Securities, Haywood Securities, Research Capital, BMO Capital Markets, Red Cloud Securities, and Ventum Financial.

Koryx Copper President and CEO Heye Daun noted the significant participation of Namibian investors, who contributed more than 40% of the total raise.

“This is a very strong vote of confidence from Namibian investors who are playing an increasingly important part in the evolving shareholder base of Koryx Copper and who have endorsed our strategy for the fast-tracked development of the world-class, long-life and low-cost Haib copper deposit in the south of Namibia,” Daun said.

The proceeds will be used to accelerate work on the Haib Copper Project, including ongoing technical studies, project optimisation, and exploration activities ahead of the company’s Preliminary Economic Assessment (PEA) and Pre-Feasibility Study (PFS).

Namibian firm Cirrus Capital (Pty) Ltd. earned C$374,455 (about N$5.14 million) in finder’s fees for the private placement.

The underwriting syndicate received a 6% cash commission and 571,430 compensation warrants exercisable at C$1.05 per share until July 2027.

Insiders, including directors and officers of Koryx, collectively subscribed for 390,476 shares worth C$410,000 (approximately N$5.63 million), qualifying as a related-party transaction under Canadian regulations. However, the transaction falls within the exemption thresholds and does not require approval from minority shareholders.

Final approval from the TSX Venture Exchange remains pending.

The Haib deposit, located near Noordoewer in Namibia’s ǁKaras Region, is one of the oldest known porphyry copper systems globally and is being positioned by Koryx as a long-life, low-cost asset critical to the global energy transition.

 

 

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In