• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 16, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Galp and partners find ‘significant column of light oil’ on Mopane-2X in the Orange Basin

    Sintana moves to list on NSX, opens offshore oil play to Namibians

    Namibia Critical Metals appoints metallurgy VP to advance Lofdal project

    Namibia Critical Metals appoints metallurgy VP to advance Lofdal project

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

by Editor
May 3, 2025
in Uranium
0
Elevate Uranium expands mineralisation at Namib IV at the Koppies Project
526
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium is expanding the mineralisation area at the Namib IV with a drilling program scheduled for completion early in the June quarter.

Namib IV is only 10 kilometres from the southern portion of the Koppies resource and is part of the Koppies Uranium Project.

The mineralisation at Namib IV starts within 5.5 metres of the surface for all holes.

Elevate Uranium says this indicates that the bulk of the mineralisation is expected to be shallow in depth, similar to that identified at the Koppies resource.

The current drilling program tests the extent of mineralisation by systematically stepping out with drill lines that are nominally 400 metres apart.

A second drill rig is testing a range of targets beyond the known mineralised area, with 308 holes for 8,639 metres drilled during the March quarter.

As additional resources are delineated at Namib IV, they will be added to the total Koppies Uranium Project resource base and used to extend the potential life of the mine or allow an increased production rate at any future mining operation at Koppies.

During the March quarter, the company continued pre-development activities to demonstrate the potential benefits of its proprietary U-pgrade™ beneficiation process.

The demonstration plant is designed to confirm, at a scalable size and operating continuously, that the U-pgrade™ process can remove gangue waste material and concentrate uranium mineral into a low-mass, high-grade concentrate before leaching.  

This trial is designed to de-risk the U-pgrade™ process before commercialisation.

The design and construction of the plant are scheduled, with completion expected by mid-2025.

Elevate Uranium completed a drill program of 106 holes for 2,977 metres at the Hirabeb during the quarter.

The program intersected mineralisation northwest of the current resource area and confirmed the mineralisation remains open to the north and northwest.

Even though the program successfully expanded the mineralised envelope, drilling at Namib IV has been prioritised whilst the team is assessing the Hirabeb results.

Elevate Uranium also undertook an exploratory drill program on EPL 6663 and EPL 7279 during the quarter, targeting anomalies identified from airborne radiometric and electromagnetics.  

There was no significant mineralisation intersected from 76 holes for 2,128 metres, and Elevate Uranium is reviewing the results to determine if future drilling is warranted on these tenements east of the Koppies resource.

Elevate Uranium has put on hold the drilling program at the Capri tenement, about 25 kilometres from the company’s Marenica Uranium Project, to assess the results.

The drilling completed during the March quarter was testing extensions to the mineralised envelope.  

A total of 123 holes for 3,494 metres were drilled with the notable intersections.  

Drilling at the Marenica Uranium Project, 25 kilometres north of Orano’s Trekkopje Uranium Project, expected to be completed early in the June quarter, has produced some encouraging results that will be followed up.

Drilling during the quarter was focused on exploration outside of the resource area on anomalies generated from airborne surveys and Koppies basement-style targets.  

The program is a total of 204 holes for 6,477 metres drilled during the quarter.

Share210Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

April 16, 2026
88 Energy targets 2026 for first exploration well in Owambo basin

88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

April 16, 2026
Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

April 16, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In