• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, June 7, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Snow Lake Resources targets Engo Valley maiden resource estimate 2H of 2025

by Editor
March 20, 2025
in Uranium
0
Snow Lake Resources targets Engo Valley maiden resource estimate 2H of 2025
509
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Snow Lake Resources says mobilisation has begun for the phase 2 drill program at its Engo Valley Uranium Project.

The Engo Valley Uranium is an exploration stage project located in the Skeleton Coast of Namibia.

The phase 2 drill program will consist of up to 7,500 metres of reverse circulation and diamond drilling.

It is designed to provide a drill database sufficient to calculate a maiden uranium mineral resource estimate by SK-1300.

Following its recent capital raisings totalling ~US$37 million, Snow Lake is fully funded to undertake phase 2 and calculate and publish a maiden mineral resource estimate for Engo Valley.

Snow Lake Resources CEO Frank Wheatley says this program aims to develop a drill database sufficient to calculate a maiden resource estimate at Engo Valley in the second half of 2025.

“With global demand for uranium continuing to increase due to the ongoing construction of nuclear reactors worldwide, coupled with the US government’s renewed focus on nuclear energy, we believe our phase 2 drill program at Engo Valley provides us with the opportunity to delineate a potentially economic uranium resource in Namibia, currently the third largest global uranium producer,” Wheatley says.

Phase 2 will focus on the main uranium occurrence and the D1 target area.

Several drill holes will be undertaken on targets identified by the radon cup survey (undertaken in 2024) outside the main uranium occurrence and D1.

Downhole radiometrics will be conducted on each drill hole.

With mobilisation to the site now underway, preparing a maiden mineral resource estimate, assuming drilling goes according to plan and assay results are received promptly, is targeted for completion during the second half of 2025.

Snow Lake Uranium completed phase 1 drill program, which confirmed significant uranium mineralization in February 2025.

The phase 1 drill program consisted of 1,570 metres of drilling in 20 reverse circulation drill holes, with downhole radiometrics completed on each drill hole.

Eleven of the 20 drill holes in phase 1 returned mineralised intersections greater than 100 ppm eU3O8, ranging from 1 meter to 20 meters in width.

Initial chemical assays confirmed a positive correlation between chemical assays and equivalent radiometric assays

The geology of the twinned drill holes confirmed a positive correlation to the lithologies from the exploration work undertaken in the 1970s.

Share204Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe