• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, September 17, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Unicorn targets Klein Aub copper production within 12 months

    Unicorn targets Klein Aub copper production within 12 months

    Ongwe launches 5,000m maiden drilling at Nguni gold prospect

    Ongwe launches 5,000m maiden drilling at Nguni gold prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Wia Gold targets second half of 2026 for Kokoseb Project mining licence

by Editor
February 19, 2025
in Gold
0
wia
532
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Wia Gold wants to complete the definite feasibility study by mid-2026 and expects the mining licence to be awarded by the second half of 2026 for the Kokoseb project.
An updated mineral resource estimate and the application for a mining licence are due in the third quarter of 2025 after the submission of the scoping study.
The company has increased the number of drilling rigs to three diamond and three reverse circulation rigs for exploration and infill drilling.
This year, Wia Gold will appoint consultants focusing on mine scheduling and design, additional metallurgical test work, environmental studies, hydrology studies, process plant engineering, non-process site infrastructure, tailings disposal, energy and power supply, and capital and operating costs.
Wia Gold plans to add two reverse circulation rigs to the existing one reverse circulation and two diamond drilling rigs.
The company also wants to provide additional resources in the Central, NW, and Northern Zones, plus conversion of inferred to indicated mineral resources.
The Kokoseb Gold Project is in northwest Namibia, approximately 320 km by road from the capital city of Windhoek.
Kokoseb lies within the Okombahe exploration licence, held under a joint venture by Wia (80%) and Epangelo (20%).
The Okombahe licence is part of Wia Gold’s broader Damaran Belt tenure in Namibia, which consists of 12 tenements across a total area of over 2,700 km2.
On 16 April 2024, Wia Gold announced an updated inferred mineral resource estimate of 2.12Moz at 1.0 g/t Au, at a cut-off grade of 0.5 g/t Au, including a higher-grade gold portion of 1.53Moz at 1.4 g/t Au using a cut-off grade of 0.8 g/t Au at a discovery cost of less than US$3/oz.
Wia Gold entered a joint venture with Epangelo to acquire the Okombahe exploration licence in June 2019.
The joint venture discovered the Kokoseb project in Q3 2021, with the latest mineral resource estimate from April 2024.
The mineral resource estimate includes higher-grade 1.53 Moz at 1.4 g/t Au (at 0.8 g/t cut-off) from 47 km of drilling.
The project’s discovery and definition cost is only US$2.8/oz, while metallurgical testwork concluded gold recoveries of 92%.

 

Share213Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

September 17, 2026
Osino Resources on track to employ 1 000 Namibians at Twin Hills Gold Project

Shandong Gold Mining says Twin Hills gold mine to cost N$8.9bn

September 17, 2026
Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

September 16, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In