• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, May 2, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Uis Tin Mine’s measured resource tonnage increased by 30% to about 27.3 million tons

by Editor
February 7, 2025
in News
0
Uis Tin Mine’s measured resource tonnage increased by 30% to about 27.3 million tons
568
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has updated the mineral resource estimate for the Uis Tin Mine announced on 6 February 2023 and incorporated analytical results from the final 16 drill holes of the 2022 programme, as well as a volume depletion surface as of 30 August 2024.
The update shows an increase in average lithium grade and volumes of the measured and indicated resource classifications.
It also shows an increase of the average lithium grade to 0.79% Li2O from 0.73% Li2O declared in 2023.
The contained lithium oxide increased from 587,000 tons to 610,000 tons, while the measured resource tonnage increased by 30% to about 27.3 million tons.
The indicated resource tonnage increased by 2% to 17.5 mt, but the mineral resource estimate total tonnage decreased from 81 mt in 2023 to 77.5 mt due to depletion from ongoing mining.
The 145 historical ISCOR drill holes, comprised of eight diamond, 137 reverse circulation, 77 validation, 48 diamond and 29 reverse circulation holes drilled by Andrada between 2018 and 2023, informed the mineral resource estimate.
The Andrada drill holes were completed on a nominal grid spacing of 60 metres by 60 metres, with wider spacing of up to 80 metres by 200 metres for the deeper portions.
Most holes were drilled vertically, but selected shallower holes were inclined at angles up to -70° southeast to obtain intersections more perpendicular to the dipping pegmatite.
The updated mineral resource estimate is reported by the JORC Code (2012) and identifies 77.51 Mt of mineralised pegmatite with an average grade of 0.79% Li2O, 0.15% Sn, and 82 ppm Ta.
This mineral resource estimate includes 27.33 mt at an average grade of 0.82% Li2O, 0.15% Sn, and 90 ppm Ta for the near-surface measured category, 17.50 mt at an average grade of 0.79% Li2O, 0.15% Sn, and 86 ppm Ta for the indicated category, and 32.68 mt with an average grade of 0.76% Li2O, 0.16% Sn, and 73 ppm Ta for the inferred category.
The contained lithium is also stated in the lithium carbonate equivalent, the metal converted to lithium carbonate by a factor of 5.323.
Andrada Mining CEO Anthony Viljoen said this updated resource estimate is another positive step toward becoming a premiere African producer of tin, lithium, and tantalum.
“Critically, this updated resource also allows us to quantify better the potential lithium concentrate credits we can generate alongside our tin production, optimising the overall project economics,” Viljoen said.
He added that the updated mineral resource estimate further enhances the project economics of the Uis mine operations and will enable the determination of a lithium mineral reserve.

Share227Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In