• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, October 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia targets 57% processed mineral exports by 2030

    Petroleum Bill passes second reading with 50 votes

    Midas clears key hurdle in Otavi copper project acquisition

    Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Diamond industry faces familiar slump, but recovery may be different this time

    Diamond industry faces familiar slump, but recovery may be different this time

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval allocates US$7.1m to Namibia copper exploration

    Madison Metals starts drilling at Khan Project in Namibia

    Critical One plans Critical Two Energy for Namibian uranium assets after failed US$3.5m sale

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate Uranium to operationalise its U-pgrade™ demonstration plant in Namibia late 2025

by Editor
February 6, 2025
in Uranium
0
Elevate Uranium to operationalise its U-pgrade™ demonstration plant in Namibia late 2025
580
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium’s U-pgrade™ demonstration plant will be operational in Namibia at the Koppies project by late 2025.

The company started pre-development activities to demonstrate the value of its proprietary U-pgrade™ beneficiation process, focusing on the Koppies resource during the quarter ending December 31, 2024.

Elevate Uranium completed a placement to raise US$25 million to develop the U-pgrade™ uranium ore beneficiation process and advance development activities at Koppies.

U-pgrade™ is Elevate Uranium’s 100% owned breakthrough beneficiation process, which reduces ore mass by greater than 95% before leaching, concentrating uranium, and increasing the leaching grade. 

U-pgrade™ increases the Marenica Uranium Project ore grade from 93 ppm to 5,000 ppm U3O8 and reduces capital and operating costs by approximately 50% compared to conventional processing.

The Koppies Uranium Project’s total mineral resources is 66.1 Mlb U3O8, 78% of which is classified as indicated category.

Drilling at the Hirabeb deposit, with a maiden resource of 10.2 Mlb and now incorporated as part of the Koppies Uranium Project, continues through March 2025.

In the last quarter, Forsys Metals drilled 206 holes for 5,778 metres.

Exploration recommenced at the Namib IV tenement discovered in 2021, recommenced during the quarter, and now a large area of continuous mineralisation has been identified.

Future in-fill drilling will focus on confirming a mineralised polygon, aiming to delineate and report a maiden resource during 2025.

Namib IV is only 10 kilometres from the southern portion of the Koppies resource and has been included in the Koppies Uranium Project.

The current phase of drilling at the Capri tenement, only 25 kilometres from the Marenica Uranium Project, is focused on reducing the spacing between drill lines to define the mineralised envelope better to delineate and report a maiden resource during 2025.

A total of 263 holes for 7,488 metres were drilled during the quarter.

The Marenica Uranium Project is 25 kilometres north of Orano’s Trekkopje Uranium Project and only 25 kilometers southeast of the company’s Capri tenement.

Drilling at Marenica recommenced during the quarter but focused on exploration outside the resource area.

The drilling of an exploration target south of the MA7 deposit has identified some encouraging intersections, with additional drilling planned for late Q1 or Q2 2025.

A total of 184 holes for 5,756 metres were drilled during the quarter.

Share232Tweet145
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia targets 57% processed mineral exports by 2030

Petroleum Bill passes second reading with 50 votes

October 20, 2026
Midas clears key hurdle in Otavi copper project acquisition

Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

October 20, 2026
African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

October 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In