• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, November 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Ministry’s amendments delay Tower’s farm-out deal

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    Noronex, South32 plan 3,000m Kalahari copper drilling campaign

    Rosatom executive says Namibia approves uranium test-well drilling

    Rosatom executive says Namibia approves uranium test-well drilling

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    BW engages 50 companies over Kudu gas project farm-down

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy finalises Namibian drilling tenders for uranium project

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Midas latest drill results confirm 800-metre copper-silver at Spaatzu discovery

    Midas deploys eight drilling rigs to define three Otavi copper resources

    Public review opens for Koppies West uranium project application

    Elevate cuts drilling to one rig as Marenica resource update nears

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Cazaly Resources completes initial drill testing at the Kaoko lithium project

by Editor
October 7, 2024
in News
0
Cazaly Resources completes initial drill testing at the Kaoko lithium project
537
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Cazaly Resources has completed the initial drill testing at the Ohevanga prospect on the Kaoko lithium project in northern Namibia.
Samples have been sent to the sample preparation lab in Okahandja for crushing and grinding.
The sample pulps will then be forwarded to the ALS laboratory in Ireland for analysis.
The company started a 1,200-meter reverse circulation drilling program on September 9, 2024.
The Ohevanga lithium target measured 120 km2 and was initially identified in broad 1 km
spaced surface samples.
Infill surface sampling confirmed the continuity of anomalous lithium mineralization +110 ppm lithium and is currently considered stratiform.
At this early stage, the potential deposit style is considered sedimentary hosted. Sedimentary lithium deposits accumulate as lithium is transported into basins where it reacts with other minerals, creating chemical bonds weaker than those found in spodumene (pegmatites) and stronger than those found in brines.
The Kaoko Belt consists of sedimentary rocks of the Damaran Supergroup deposited during rifting and overlies the Congo Craton.
The nature of further work programs will depend on the exploration results received from the drill program.
All exploration results are currently pending.
The Kaoko Critical Minerals project EPL6667 is located in northern Namibia. The tenement is held in joint venture with Cazaly 95% and local geological company KDN Geo Consulting CC 5%.
The tenement was renewed on June 21, 2024, for a 3-year term to June 21, 2027.
Cazaly has the required Environmental Clearance Certificate for EPL6667 for ongoing exploration activities.
There are no known impediments.
Rio Tinto Namibia Pty Ltd conducted work in the area in 1993-95 and drilled for copper and zinc south of the Kaoko Project.
Kunene Resources Ltd. and First Quantum Minerals Ltd. (JV) conducted regional geochemical sampling between 2011 and 2015.
Kunene also interpreted regional geophysical data, landsat data, and satellite imagery and completed geological mapping.
Other historical work includes oil, gas and uranium exploration in the area

.

Share215Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada secures N$98m local funding as Lithium Ridge drilling delivers high-grade results

Andrada pumps N$775m into Namibia’s economy in one year

November 2, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Ministry’s amendments delay Tower’s farm-out deal

November 2, 2026
Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

Noronex, South32 plan 3,000m Kalahari copper drilling campaign

November 2, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe