• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, November 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Ministry’s amendments delay Tower’s farm-out deal

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    Noronex, South32 plan 3,000m Kalahari copper drilling campaign

    Rosatom executive says Namibia approves uranium test-well drilling

    Rosatom executive says Namibia approves uranium test-well drilling

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    BW engages 50 companies over Kudu gas project farm-down

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy finalises Namibian drilling tenders for uranium project

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Midas latest drill results confirm 800-metre copper-silver at Spaatzu discovery

    Midas deploys eight drilling rigs to define three Otavi copper resources

    Public review opens for Koppies West uranium project application

    Elevate cuts drilling to one rig as Marenica resource update nears

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Trigon Metals mines 980 tons of copper ore daily at Kombat underground

by Editor
September 19, 2024
in Copper
0
Trigon Metals mines 980 tons of copper ore daily at Kombat underground
542
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Trigon Metals has mined an average of 980 tons of ore daily from its underground operations over 30 days.
The latest achievement is part of the October 2022 streaming agreement with Sprott Private Resource Streaming and Royalty (B) Corp. and Sprott Mining Inc.
The company has also announced that it will pause its open pit operations at Kombat Mine at the end of September 2024.
The reason for pausing the open pit operations is the successful recommissioning of the underground mine, with commercial production declared on May 23, 2024.
The other reason is the significant grade differential and positive contribution of the underground mining operations compared to the open pit operations.
The third reason is that the milling capacity constraint at the Kombat mine limits plant throughput to 1,000 tonnes per day, leading to higher-grade underground ore preferential feeding.
Trigon says it can fill any production shortfall by feeding off existing lower-grade stockpiles until underground production reaches full steady state.
The company has notified the open-pit mining contractor of the intended pause of open-pit mining activities and will demobilise from the operations by the end of September 2024.
Trigon Metals CEO Jed Richardson said this achievement reflects the ability to meet and surpass the feasibility study ramp-up targets and de-risks the Sprott streaming agreement.
According to Richardson, it also ensures that Trigon is not required to convert the principal advanced pursuant to the stream agreement into a loan.
“Exceeding the 900 tonnes per day average from the underground is a significant milestone for the company and a testament to the team’s dedication to delivering on our commitments.
“We are grateful to Tulela Mining and Construction, our open pit mining contractor, for their exceptional support and partnership over the last four years,” Richardson said.
Trigon Metals chief operations officer Rennie Morkel said they have faced significant challenges with the open pit, where stripping requirements have exceeded our forecasts.
Morkel said pausing open pit operations will immediately impact our operating costs, allowing us to focus on the higher-grade underground ore.
“This strategic shift enhances our ability to increase production while maintaining cost efficiency, ensuring a more sustainable and profitable operation moving forward,” Morkel said.

Share217Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada secures N$98m local funding as Lithium Ridge drilling delivers high-grade results

Andrada pumps N$775m into Namibia’s economy in one year

November 2, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Ministry’s amendments delay Tower’s farm-out deal

November 2, 2026
Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

Noronex, South32 plan 3,000m Kalahari copper drilling campaign

November 2, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe