• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, August 15, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Koryx nears end of Haib infill drilling as resource update looms

    Koryx nears end of Haib infill drilling as resource update looms

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Botshiwe urges faster reforms to unlock mining investment

    ECC delays holding back mining investment, Chamber warns

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Trigon Metals mines 980 tons of copper ore daily at Kombat underground

by Editor
September 19, 2024
in Copper
0
Trigon Metals mines 980 tons of copper ore daily at Kombat underground
540
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Trigon Metals has mined an average of 980 tons of ore daily from its underground operations over 30 days.
The latest achievement is part of the October 2022 streaming agreement with Sprott Private Resource Streaming and Royalty (B) Corp. and Sprott Mining Inc.
The company has also announced that it will pause its open pit operations at Kombat Mine at the end of September 2024.
The reason for pausing the open pit operations is the successful recommissioning of the underground mine, with commercial production declared on May 23, 2024.
The other reason is the significant grade differential and positive contribution of the underground mining operations compared to the open pit operations.
The third reason is that the milling capacity constraint at the Kombat mine limits plant throughput to 1,000 tonnes per day, leading to higher-grade underground ore preferential feeding.
Trigon says it can fill any production shortfall by feeding off existing lower-grade stockpiles until underground production reaches full steady state.
The company has notified the open-pit mining contractor of the intended pause of open-pit mining activities and will demobilise from the operations by the end of September 2024.
Trigon Metals CEO Jed Richardson said this achievement reflects the ability to meet and surpass the feasibility study ramp-up targets and de-risks the Sprott streaming agreement.
According to Richardson, it also ensures that Trigon is not required to convert the principal advanced pursuant to the stream agreement into a loan.
“Exceeding the 900 tonnes per day average from the underground is a significant milestone for the company and a testament to the team’s dedication to delivering on our commitments.
“We are grateful to Tulela Mining and Construction, our open pit mining contractor, for their exceptional support and partnership over the last four years,” Richardson said.
Trigon Metals chief operations officer Rennie Morkel said they have faced significant challenges with the open pit, where stripping requirements have exceeded our forecasts.
Morkel said pausing open pit operations will immediately impact our operating costs, allowing us to focus on the higher-grade underground ore.
“This strategic shift enhances our ability to increase production while maintaining cost efficiency, ensuring a more sustainable and profitable operation moving forward,” Morkel said.

Share216Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Koryx nears end of Haib infill drilling as resource update looms

Koryx nears end of Haib infill drilling as resource update looms

August 14, 2026
Wia Gold says it has enough funding to develop Kokoseb

Wia Gold says it has enough funding to develop Kokoseb

August 13, 2026
John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

August 12, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In