• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, November 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Ministry’s amendments delay Tower’s farm-out deal

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    Noronex, South32 plan 3,000m Kalahari copper drilling campaign

    Rosatom executive says Namibia approves uranium test-well drilling

    Rosatom executive says Namibia approves uranium test-well drilling

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    BW engages 50 companies over Kudu gas project farm-down

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy finalises Namibian drilling tenders for uranium project

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Midas latest drill results confirm 800-metre copper-silver at Spaatzu discovery

    Midas deploys eight drilling rigs to define three Otavi copper resources

    Public review opens for Koppies West uranium project application

    Elevate cuts drilling to one rig as Marenica resource update nears

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Noronex has launched a big gravity survey over its Humpback-Damara project

by Editor
August 23, 2024
in Copper
0
Noronex has launched a big gravity survey over its Humpback-Damara project
518
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Noronex Limited started the extensive gravity survey over the Humpback-Damara Project within its Namibia’s Kalahari Copper Belt exploration portfolio.
The Humpback Project is located in newly granted 100%-owned Noronex tenements and contains several domal structures encompassing the prospective NPF-D’Kar contact.
Copper mineralisation intersected in historical and recent Noronex drilling appears to have many hallmarks of the deposits defined in Botswana over 400km to the east, including the large Zone 5 deposit (167Mt @ 2.1 % Cu, owned by MMG).
Historical drilling at Fiesta had defined a steeply dipping sheet of mineralisation over 4km long, corresponding to the prospective contact of shales and sandstones in the D’Kar Formation on the western plunge of a sheared antiformal structure.
An 800m by 100m gravity survey will build on the geological knowledge gained from magnetics and drilling to help define structural closures and highlight favourable horizons along the prospective reductant horizon.
Drill positions will be finalised on completion of the gravity survey.
The Damara Zone encompasses the northern margin of the Kalahari Copper Belt, which generally has between 0-100m of Kalahari cover and has never been drill tested.
There is excellent potential along this northern margin for the discovery of copper mineralisation in the basement shear zone, as encountered in the Central African Copper Belt with deposits such as Lumwana (1Bt @ 0.6% Cu, Barrick) and related to Iron Oxide alteration systems in Zambia such as Kitumbu (345Mt @ 0.5% Cu, Junction Mining).
A detailed gravity survey has commenced across the three project areas – the Okatumba Gate, Otjozondera and Otjiuapehuri prospects – to assist in understanding the complex aeromagnetic targets.
The survey will initially be conducted at 800 x 200m centres with in-fill lines at 400 x 100m in critical areas to define drill targets.
A drilling program is planned for later in the quarter, initially at Fiesta and then at the Damara Zone.
Funding of A$750,000 for the first quarter under the earn-in agreement with South32 has been received to fund the activities underway with the Namibian exploration team.
By the terms of the earn-in agreement, South32 shall provide A$15m in exploration funding to Noronex over five years in return for an option to acquire 60% of the Humpback-Damara Project.
The strategic alliance with South32 has also commenced, with early projects in Namibia being identified for further analysis to submit to the committee.
A payment of A$200,000 has been received from South32 for the commencement of the Strategic Alliance.
Under the Earn-in Agreement, South32 will earn into the regional package of seven granted EPLs and four recent EPL applications that cover over 7,677 square kilometres.

Share207Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada secures N$98m local funding as Lithium Ridge drilling delivers high-grade results

Andrada pumps N$775m into Namibia’s economy in one year

November 2, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Ministry’s amendments delay Tower’s farm-out deal

November 2, 2026
Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

Noronex, South32 plan 3,000m Kalahari copper drilling campaign

November 2, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe