• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

ReconAfrica targets October for completing Naingopo well drilling in Kavango Basin

by Editor
August 7, 2024
in Oil & Gas
0
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m
516
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

ReconAfrica has drilled the Naingopo exploration well on PEL 73 in the Kavango basin to a depth of 1,450 meters, with surface casing set at 350 meters and a first casing string set at 1,200 meters.
The company spudded the well early last month, and the well has been tracking drilling depth and well cost estimates, with everything on schedule and plan.
The well aims to drill to a depth of approximately 3,800 meters (12,500 feet) and is expected to encounter four primary reservoir intervals targeting oil and natural gas.
The well would be a significant play-opening discovery if successful, providing access to multiple drill-ready prospects.
The Naingopo well is targeting 181 million barrels of unrisked prospective light and medium oil resources, or 937 billion cubic feet of prospective natural gas resources, on a 100% working interest basis, based on the most recent prospective resources report prepared by Netherland, Sewell & Associates, Inc.
Elsewhere on PEL 73, ReconAfrica started construction on the access road leading to Prospect P, the second Damara Fold Belt exploration well, targeted to commence drilling in Q4 2024.
Prospect P targets 309 million barrels of unrisked prospective light and medium oil resources or 1.6 trillion cubic feet of prospective natural gas resources on a 100% working interest basis.
The company is working with Polaris Natural Resources Ltd. to test the use of vibroseis as a source for the potential acquisition of 3D seismic covering a section of the Kavango Rift Basin.
Current testing is being undertaken to compare results using the vibroseis as a source compared to previously acquired data using the acceleration weight drop system. The testing results will provide the data needed to plan and execute a potential 3D seismic program in 2025.
ReconAfrica CEO Brian Reinsborough said the Naingopo well is drilling on schedule and budget to a depth of 1,450 meters.
Reinsborough said they would soon be drilling into key, targeted intervals throughout the remainder of the well.
“We are targeting to complete drilling in early October, with results after that,” Reinsborough said.
“We are executing multiple facets of our high-impact exploration program, which we expect to deliver significant value to shareholders,” Reinsborough said.
He added that the joint venture agreement with BW Energy focuses on returns to operations associated with the Naingopo exploration well and other activities on PEL 73.

 

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Public review opens for Koppies West uranium project application

Elevate grows Namibian uranium footprint to 116 million pounds

April 28, 2026
Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

Galp confirms three-well drilling and testing campaign for Mopane

April 28, 2026
Deep Yellow says Tumas engineering now more than 60% complete

Deep Yellow says Tumas engineering now more than 60% complete

April 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In