• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, June 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Bannerman says Etango passes key construction milestones as workforce tops 560

    Bannerman says Etango passes key construction milestones as workforce tops 560

    Celsius Resources in early-stage discussions for possible partnership for Opuwo Cobalt Project

    Aluminium Corporation of China agrees to acquire Opuwo cobalt-copper project in US$15 million deal

    New Haib Copper Project indicated and inferred estimates show decrease in tonnage but increase in value

    Koryx reports 714m copper intercept at Haib

    Midas Minerals prepares to transition copper assets to full scale drilling

    Maiden Deblin drill hole intersects 57m of visible copper mineralisation in Namibia

    Arkle set to drill after confirming uranium across Erongo targets

    Arkle set to drill after confirming uranium across Erongo targets

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Forsys Metals resource extension program at Norasa yield positive results

by Editor
May 29, 2024
in Uranium
0
Forsys Metals starts a 29-borehole drilling program at Valencia Uranium Project
565
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Forsys Metals says one of the boreholes at the Norasa Uranium Project has returned an average of 194 ppm U3O8 over a 232-meter interval.
The Norasa Uranium Project comprises the Valencia Uranium deposit under mining license 149 and the nearby Namibplaas Uranium deposit under EPL 3638 in the Namib Desert.
Forsys Metals announced in February that it would complete a broad-ranging initiative to reassess its 2015 feasibility study for the Norasa Project in mid-2024.
Since then, the company has drilled 4,332 metres in 32 boreholes and received results from 21 boreholes.
The drilling program strategy is to expand and upgrade the Valencia resources adjacent to the central pit and the north and northeast of the pit.
To date, drilling has focused on two zones that have the potential to extend the Valencia Main deposit, at Valencia West and Valencia South, to depths of up to 380 metres below the surface.
The best-mineralised intercept is in borehole VA24-022, drilled at Valencia South, which has 232 metres of continuous intersection, sub-parallel to the main direction of mineralisation, from the surface, averaging 194 ppm U3O8. This includes 43 m at 416 ppm U3O8 to the bottom of the pre-collar percussion hole.
Forsys has identified additional resource potential at the Jolie Zone, Valencia East, Bundu, and Valencia North, where 28 boreholes are scheduled, comprising 2,280 metres of drilling across the four targets.
One of the three boreholes at the Jolie Zone intersected 41 metres of mineralisation at 185 ppm U3O8.
At the Valencia East deposit, about 500 m northeast of the central pit, Forsys has planned 14 boreholes to test the existing resource and potentially extend the deposit.
Forsys discovered mineralised granite, named the Bundu Zone, about 1 km northeast of the main pit, where the company initially planned three boreholes.
The company is testing the Valencia North prospect, about 1 km north of the Valencia pit, with three boreholes.

 

Share226Tweet141
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Bannerman says Etango passes key construction milestones as workforce tops 560

Bannerman says Etango passes key construction milestones as workforce tops 560

June 30, 2026
Celsius Resources in early-stage discussions for possible partnership for Opuwo Cobalt Project

Aluminium Corporation of China agrees to acquire Opuwo cobalt-copper project in US$15 million deal

June 30, 2026
New Haib Copper Project indicated and inferred estimates show decrease in tonnage but increase in value

Koryx reports 714m copper intercept at Haib

June 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In