• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Tsumeb smelter smelted 54.773 tonnes of concentrate copper in 1Q 2024

by Editor
May 8, 2024
in Copper
0
Dundee Precious Metals contemplates selling Tsumeb smelter
560
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

The Tsumeb smelter smelted 54,773 tonnes in the first quarter of 2024, ten times more than in the same quarter in 2023.

Dundee Precious Metals, which sold its 98% stake to the Chinese company Sinomine in March 2024, said the increase was due to plant availability following the completion of the maintenance work in the third quarter of 2023.

The cash cost per tonne of complex concentrate smelted in the first quarter of 2024, US$329, was 16% lower than the corresponding period in 2023 due primarily to higher volumes of complex concentrate smelted, higher sulfuric acid by-product credits, and a weaker South African Rand relative to the US dollar.

Meanwhile, Dundee Precious Metals says the sale of the Tsumeb Smelter to Sinomine could close in the 3rd quarter of 2024 after approvals from the Namibia Competition Act and approvals required from Chinese regulatory authorities for overseas investments.

The company’s decision to sell its 98% stake in the smelter in March 2024 has resulted in a significant cash consideration of US$49 million on a debt-free and cash-free basis. This is subject to normal working capital adjustments following closing, further enhancing our financial position.

However, as of March 31, 2024, Dundee is entitled to a cash payment of about US$17,9 million collected from IXM SA for the sale of metal recovered at the smelter.

Dundee lists the Tsumeb assets and liabilities as held for sale in the condensed interim consolidated statement of financial position as at March 31, 2024, and December 31, 2023.

The smelter’s operating results and cash flows have also been presented as discontinued operations in the condensed interim consolidated statements of earnings (loss) and cash flows for the three months ended March 31, 2024, and 2023. 

Dundee says that specific comparative figures in the condensed interim consolidated statements of earnings (loss) and cash flows have been reclassified to conform with the current year presentation.

 

Share224Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

April 29, 2026
Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

April 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In