• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Safi Silver receives third US$3m payment from Kombat mine sale

    Namibia targets 57% processed mineral exports by 2030

    Petroleum Bill passes second reading with 50 votes

    Midas clears key hurdle in Otavi copper project acquisition

    Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Diamond industry faces familiar slump, but recovery may be different this time

    Diamond industry faces familiar slump, but recovery may be different this time

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Trigon Metals braces for Kombat mine underground ops after 17 years

by Editor
March 4, 2024
in Copper
0
Trigon Metals braces for Kombat mine underground ops after 17 years
537
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Kombat Mine underground operations will start after 17 years, and Trigon Metals says the next 12 months will mark a pivotal period.
To better manage the restart, Trigon has reviewed its strategy, mine planning, and capital for both open pit and underground operations to manage restart risks and ensure a high-grade product for the plant.
Trigon Metals has decided to postpone the expansion of its processing plant capacity from 30ktpm to 60ktpm, initially planned for 2024 to 2025.
This delay allows the underground operations to establish a performance track record and be ramped to a steady state of 30ktpm, ensuring a prudent and informed expansion timeline.
Meanwhile, Trigon Metals has reported an operating profit of US$581,518 for the three months and $474,722 for the nine months ending December 31, 2023.
The Canadian company also reported net losses for the three months of US$8,095,812 and US$14,914,218 for the nine months ending December 31, 2023.
Trigon attributed the losses to the non-cash accretion of the Sprott stream advances and property plant and equipment depreciation of US$7,656,790 for the three months and US$12,406,984 for the nine months ending December 31, 2023.
The company, however, reduced the net operational cash outflows from US$5.553.687 for the nine months ending December 31, 2022, to US$2,554,215 for the nine months ending December 31, 2023.
According to Trigon, this attests to management’s emphasis on operational cost control measures implemented pre-production and during the commissioning process.
Trigon Metals says For the quarter, 81,479 tonnes of ore were processed at an average grade of 0.95% copper, falling short of the planned 87,000 tonnes at 1.2% copper.
The Kombat Mine operations were robust in October when commercial production started, but contractor equipment availability challenges affected November production, which was resolved in December.
Trigon says efforts to recover lost production exposed weaknesses in our grade control protocol, resulting in lower grades mined in November and December.

Share215Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
African Critical Elements targets Karibib lithium production within three years

African Critical Elements targets Karibib lithium production within three years

October 22, 2026
Paladin spends US$11m building uranium stockpiles at Langer Heinrich

Paladin spends US$11m building uranium stockpiles at Langer Heinrich

October 22, 2026
Column – Beyond the source: How mines can investigate downstream process impacts

Column – Beyond the source: How mines can investigate downstream process impacts

October 21, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In