• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, September 17, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Unicorn targets Klein Aub copper production within 12 months

    Unicorn targets Klein Aub copper production within 12 months

    Ongwe launches 5,000m maiden drilling at Nguni gold prospect

    Ongwe launches 5,000m maiden drilling at Nguni gold prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

B2Gold says Antelope deposit has potential to develop into an underground mining operation

by Editor
January 31, 2024
in Gold
0
B2Gold says Antelope deposit has potential to develop into an underground mining operation
577
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

B2Gold says the Antelope deposit has the potential to develop into an underground mining operation, which could complement the expected processing of stockpiles at the Otjikoto mill from 2026 through 2031.
The Antelope deposit, about 3km south of the Otjikoto Gold Mine, was discovered in 2022 following deep drill testing on three-dimensional models of magnetic inversion data.
The deposit, which comprises the Springbok Zone, the Oryx Zone, and a possible third structure, Impala, is subject to further confirmatory drilling.
The current gold production estimates at Otjikoto are expected to be between 180,000 to 200,000 ounces in 2024 and 2025, just under 100,000 ounces in 2026, and stepping down to sub 50,000 ounces from 2026 through 2031 during the processing of low-grade stockpiles.
The open pit operations at Otjikoto are anticipated to conclude in 2025, while underground mining operations at Wolfshag will continue through 2026.
B2Gold has set aside a US$9m budget for the 2024 exploration, focusing predominantly on the Antelope deposit, the largest drill program since the definition of the Wolfshag discovery in 2012.
A 39,000 m drill program has been planned to define and expand the Antelope deposit, with the initial Mineral Resource estimate at the Antelope deposit anticipated by the third quarter of 2024.
In a statement Wednesday, B2Gold said the drill results at the Springbok Zone and Oryx Zone indicate the potential for possible underground development of the Antelope deposit, which could begin to contribute to gold production at Otjikoto in 2026
The company said the underground mining of the Antelope deposit can supplement stockpile processing through 2031 and increase gold production levels to over 100,000 ounces per year from 2026 through 2031.
“An initial Mineral Resource estimate at the Antelope deposit is anticipated by the third quarter of 2024, with an internal scoping study on an underground mining operation to be completed by the first quarter of 2025,” B2Gold said.

Share231Tweet144
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

September 17, 2026
Osino Resources on track to employ 1 000 Namibians at Twin Hills Gold Project

Shandong Gold Mining says Twin Hills gold mine to cost N$8.9bn

September 17, 2026
Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

September 16, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In