• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, November 7, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

    Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

    Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

    Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

    Teach farmers to co-exist with mining – parliamentary committee on Omaheke exploration

    IAEA calls for more groundwater tests at Uranium One’s Wings project

    Skeleton Coast Uranium raises C$2.3 million for Namibia exploration

    Skeleton Coast Uranium raises C$2.3 million for Namibia exploration

    Paladin’s Namibia after-tax profit rises from US$1.8m to US$8.1m in September quarter

    Paladin’s Namibia after-tax profit rises from US$1.8m to US$8.1m in September quarter

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Paladin banks on J Pit to meet 5.1 million to 5.6 million pound uranium target at Langer Heinrich

    Nandi-Ndaitwah says bureaucracy nearly cost Namibia US$2.5 billion Dangote investment

    Nandi-Ndaitwah says bureaucracy nearly cost Namibia US$2.5 billion Dangote investment

    Dangote wants more investment opportunities in Namibia after US$2.5 billion commitment

    Dangote wants more investment opportunities in Namibia after US$2.5 billion commitment

    Swakop Uranium plans three-pit uranium mine on 130 km² in Erongo

    Swakop Uranium plans three-pit uranium mine on 130 km² in Erongo

    Core Energy brings in Torque Drilling for Barking Gecko campaign

    Core Energy brings in Torque Drilling for Barking Gecko campaign

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

by Editor
November 7, 2026
in Oil & Gas
0
Nandi-Ndaitwah acknowledges communication gaps over petroleum plans
492
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

President Netumbo Nandi-Ndaitwah has acknowledged shortcomings in the government’s communication of its petroleum development plans, saying Namibians need better access to information to understand what is being planned and participate meaningfully in the country’s emerging oil and gas industry.

Speaking at a town hall meeting in Swakopmund on 6 November 2026, Nandi-Ndaitwah said government institutions were not doing enough to explain their activities to the public, leaving citizens without the information needed to contribute to national development discussions.

The President, who was accompanied by senior government officials and advisers, said she had brought the head of the Upstream Petroleum Unit in the Presidency to the meeting to help residents understand developments in the sector.

“You might want to know more about the petroleum, what we are planning and all these things,” she said.

“And then the significance, the problem we have is with communication. We don’t communicate what we are doing in order to educate one another.”

Nandi-Ndaitwah said citizens should know what the Presidency was doing so they could follow government programmes, raise concerns and make suggestions about areas requiring improvement.

She also introduced an official responsible for communicating the Presidency’s activities, saying the public needed to be informed about government decisions and programmes.

The President argued that meaningful public participation depended on people having sufficient information about government activities.

“Make your inputs. Tell your president what should be done, where she did well, where she should improve. But unless you know you will not be able to do that isn’t,” she said.

Her remarks were followed later in the meeting by concerns from a young professional who questioned whether information about petroleum-sector training and capacity-building opportunities was reaching all eligible Namibians.

The participant, identified as Frida, said opportunities being communicated through the petroleum authorities were not always reaching the people who could benefit from them, particularly young professionals seeking to enter the industry.

She asked what mechanisms could be introduced to ensure that information about training programmes and opportunities was distributed more widely.

Responding to the concern, Upstream Petroleum Unit head Cornelia Shilunga explained that the government had changed the way petroleum scholarships were advertised.

She said Petrofund scholarships, previously advertised through newspapers and online platforms, were now being channelled through regional governors’ offices and regional councils to improve access across the country.

The opportunities included postgraduate studies in oil and gas management, energy economics and law, petroleum engineering, drilling engineering, subsea engineering and other technical disciplines.

Shilunga said some scholarship application periods had closed on 30 October and 6 November, while applications for a master’s programme in manufacturing engineering, specialising in welding engineering and offered in collaboration with the University of Namibia, would close on 16 November 2026.

However, the discussion revealed possible weaknesses in the new information-sharing arrangement when the Erongo governor appeared to indicate that her office had not received some of the scholarship advertisements.

Shilunga acknowledged that the distribution system needed closer monitoring to ensure that information sent to regional offices was actually received.

“Perhaps we need to make sure that once we send them through to the governor’s offices, we should then be doing follow-ups to call and to find out whether they have been received,” she said.

She undertook to improve the process following the concerns raised at the meeting.

The exchange highlighted the importance of communication between the Presidency, petroleum institutions and regional authorities as Namibia prepares its workforce for opportunities associated with oil and gas development.

Although the President did not announce a new petroleum communication strategy, her acknowledgement of the problem, together with the concerns raised about access to training, placed greater attention on how government information reaches communities and prospective participants in the sector.

The meeting also raised the question of whether existing communication channels are sufficient to ensure that Namibians, particularly those outside established industry networks, are informed about opportunities arising from petroleum development.

Share197Tweet123
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

November 7, 2026
Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

November 6, 2026
Teach farmers to co-exist with mining – parliamentary committee on Omaheke exploration

IAEA calls for more groundwater tests at Uranium One’s Wings project

November 6, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe