• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, July 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Midas targets three copper resources within six months

    Midas targets three copper resources within six months

    Askari Metals to become Highland Metals in strategic rebrand

    Askari Metals to become Highland Metals in strategic rebrand

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada returns 14.72% Li₂O as Lithium Ridge expands to 9km

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Namibian companies take leading role in Etango construction

    Namibian companies take leading role in Etango construction

    Frontier targets maiden Engo uranium resource in third quarter

    Frontier targets maiden Engo uranium resource in third quarter

    Noronex targets new Namibia drilling campaign before year-end

    Noronex targets new Namibia drilling campaign before year-end

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Bezant secures US$7 million financing package for Hope and Gorob copper project

by Editor
June 12, 2026
in Copper
0
Bezant secures US$7 million financing package for Hope and Gorob copper project
539
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

London-listed Bezant Resources Plc has secured a US$7 million (about N$126 million) project financing and offtake package for the development of its Hope and Gorob Copper Project in Namibia, clearing a major hurdle ahead of the planned start of copper concentrate production in the third quarter of 2026.

The company announced on 10 June 2026 that it had completed definitive agreements with Hartree Metals LLC covering both a secured prepayment financing facility and a long-term copper concentrate offtake arrangement linked to the Hope and Gorob operation.

The agreements mark one of the more significant project-financing developments in Namibia’s junior mining sector this year and position Bezant to move from exploration and project development to copper production.

Under the agreements, Hartree Metals will provide a US$7 million secured and convertible financing facility to fund construction activities at the Hope and Gorob mine site and commissioning work at the NLZM Processing Plant, while also securing the right to purchase 100% of the copper concentrate produced from the operation for the life of mine.

The financing arrangement effectively ties together mine development, plant commissioning, concentrate marketing and export logistics under a single strategic commercial relationship.

Bezant said mine development has continued during the due diligence and documentation process and that the project remains on schedule and within budget for first concentrate production in the third quarter of 2026.

Executive chairman Colin Bird said the company viewed the agreement as the beginning of what it hopes will become a long-term relationship across its Namibian asset base.

He said the agreements aligned with the company’s original expectations and timing following the announcement of the financing term sheet on 31 October 2025.

The Hope and Gorob development plan is built around a two-site operating structure designed to reduce processing costs and improve ore efficiency.

The first component is the Hope and Gorob mine itself, where run-of-mine ore from the copper-gold mineral resource will be crushed and subjected to multi-sensor dry ore sorting technology to separate waste material from mineralised ore before transport.

The second component involves the refurbishment and recommissioning of the existing NLZM flotation processing plant in Namibia, which had previously been placed under care and maintenance.

The plant is being repurposed to process the pre-concentrated copper-gold ore generated from Hope and Gorob into export-grade copper concentrates destined for international smelting markets.

Copper concentrate produced from the operation will be exported through the Port of Walvis Bay, Namibia’s main deep-water port, located approximately 60 kilometres from the NLZM processing facility.

Monthly concentrate shipments are expected to increase progressively as the operation ramps up production following commissioning.

The financing package itself contains several features that reflect both the risks and commercial expectations associated with junior mining project development.

The facility will be released in five separate tranches, with the final tranche payable only once pre-production commissioning activities at the NLZM plant are completed.

The loan carries a four-year term, including a 12-month grace period during which no principal or interest repayments are required before entering a straight-line repayment structure.

Interest will be charged at the Secured Overnight Financing Rate plus a 4.5% margin, together with an establishment fee equal to 1% of the total facility value.

Hartree Metals has also secured the option to convert all or part of the financing into Bezant shares at a conversion price of £0.0016 per share, representing a 28% premium to the company’s closing share price of £0.00125 on 10 June 2026.

In addition, Hartree Metals will receive a four-year warrant with a subscription value of US$1.75 million exercisable at £0.0011 per share, matching Bezant’s closing share price on 30 October 2025 when the original financing term sheet was announced.

The agreement further provides that if Hartree Metals’ shareholding in Bezant increases to 10% or more, the company will gain the right to nominate a director to Bezant’s board, subject to standard due diligence procedures.

As security for the facility, Hartree Metals will hold claims over certain Hope and Gorob project assets, including mine infrastructure and Bezant’s shareholdings in the project companies.

The financing agreement also comes as copper continues attracting renewed global investor interest due to growing long-term demand linked to electrification, renewable energy infrastructure and electric vehicle manufacturing.

Namibia has increasingly positioned itself as a future supplier of critical minerals and base metals required for the global energy transition, with copper exploration and development activity rising across several regions of the country.

Hope and Gorob form part of a broader wave of mining investment now moving beyond uranium into copper, lithium, rare earths, gold and battery minerals.

The latest announcement also included an extension of the existing funding arrangements between Bezant and its long-term shareholder, Sanderson Capital Partners Limited.

The repayment deadline for a previously drawn £700,000 unsecured convertible loan facility originally entered into in November 2021 has now been extended to 30 September 2027.

The parties also agreed to extend the expiry date of 437.5 million related warrants to 30 June 2028.

The refinancing extension reduces short-term repayment pressure on Bezant as it focuses on bringing the Hope and Gorob operation into production.

Hartree Metals itself is part of the wider Hartree Partners LP group, a global commodities trading and asset management company headquartered in New York, with operations spanning energy, metals, agriculture, and financial markets.

The group employs approximately 5,000 people across more than 50 locations worldwide and is partly owned by Oaktree Capital Management.

Share216Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Report backs Ongwe’s Omatjete project with C$8.5m exploration plan

Report backs Ongwe’s Omatjete project with C$8.5m exploration plan

July 29, 2026
Cazaly preps for detailed airborne survey over largest undrilled rare earth anomaly

Cazaly preps for detailed airborne survey over largest undrilled rare earth anomaly

July 29, 2026
Midas targets three copper resources within six months

Midas targets three copper resources within six months

July 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In