• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, April 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada delays £7.7m loan repayment to fund Uis mine expansion

by Editor
April 29, 2026
in News
0
Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit
492
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining Limited has pushed back repayment of £7.7 million in convertible loan notes by a year to 2027 as it redirects capital toward expansion at its Uis Mine in Namibia and seeks to scale production.

The company said it had agreed amendments to loan notes originally issued in July 2023, extending the maturity date from 20 July 2026 to 20 July 2027 and lowering the conversion price from 9.45 pence per share to 5 pence.

The notes carry an annual interest of 12%.

The £7.7 million facility was originally raised on 18 July 2023 through the issue of 77 unsecured convertible loan notes of £100,000 each to multiple subscribers.

One of the largest participants was The Orange Trust (New York), which holds 40 loan notes valued at £4 million and owns 15.72% of the company’s issued share capital.

Andrada raised funding to support growth initiatives, including the commissioning of its tantalum circuit, a bulk sampling plant, and ongoing exploration.

Chief executive officer Anthony Viljoen said the refinancing move was aimed at supporting the company’s next growth phase.

“This strategic reset of our funding structure, following a successful equity private placement, compounds positive cash flows and enables scaling of our production profile.

“By extending the maturity date and amending the conversion price of the Loan Notes, we will free up capital to accelerate the implementation of our growth strategy,” Viljoen said.

The company said its board had reviewed how recently raised equity capital should be deployed and decided priority should be given to value-accretive operational and development activities, particularly expansion initiatives at Uis, rather than near-term debt repayment.

Andrada added that it continues to assess conventional debt financing options as part of a broader funding strategy, but believes retaining the amended loan notes provides greater flexibility during what it described as a key phase of growth.

The lower conversion price for 5 pence is intended to encourage noteholders to convert debt into equity. Andrada said the revised level still represented a 25% premium to its closing share price of 4.00 pence and a 37% premium to its 30-day volume weighted average price of 3.66 pence as at 28 April 2026.

As part of the restructuring, Andrada will also issue 15.4 million new warrants exercisable at 5 pence until 27 April 2027, replacing earlier warrants that had expired unexercised.

The move comes as Andrada advances plans to expand production at Uis, one of Namibia’s best-known historic tin operations, while also pursuing tantalum, lithium and other critical minerals opportunities from the same asset base.

Share197Tweet123
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

Andrada delays £7.7m loan repayment to fund Uis mine expansion

April 29, 2026
Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

April 29, 2026
Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

April 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In