• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 13, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

    Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

    16 mining companies pay N$5,6b in taxes in 2024

    16 mining companies pay N$5,6b in taxes in 2024

    Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

    Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

    Let’s  turn our stones into bread – Swapo secretary general Shaningwa

    Let’s turn our stones into bread – Swapo secretary general Shaningwa

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Ongombo copper-gold project’s ESIA at an advanced stage

    Ongombo copper-gold project’s ESIA at an advanced stage

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Faith after the longest-running mining court case

by admin
December 28, 2023
in News
0
Deep South’s fight over Haib copper mine licence renewal
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

 

Deep-South Resources CEO Pierre Leveille (PL) told The Extractor Magazine (TEM) that the mines ministry’s refusal to renew Deep-South Resources’ licence for the Haib Copper mine cost the company N$2,7 million in legal fees and caused a two-and-a-half-year delay.

TEM: Can you briefly describe Deep-South as a company—stakeholders, formation, and current financial position?

PL: Deep-South Resources is a Canadian company listed on the TSX Venture Exchange (TSX-V). Deep-South holds 100% of Haib Minerals (PTY) Ltd. Haib Minerals holds 100% of the Haib copper exploration licence. Deep-South also has the option to acquire up to 85% of three exploration licences in the heart of the Copperbelt in Zambia.

The largest shareholder of Deep-South, with 16% of the share capital, is Teck Resources (the largest diversified Canadian mining company). Management and some directors hold about 12% of the share capital. The balance of 72% is spread among the public (about 300 shareholders). We have about N$5 million in cash.

TEM: When and how did Deep-South come to Namibia to invest in the Haib copper mine?

PL: A group of Canadian investors and myself, with some Namibian investors, acquired all the shares of Deep-South Mining Company (PTY) Limited in 2016. Deep-South Mining is a private Namibian company holding 30% of Haib Minerals. The balance of 70% has been held by Teck Resources since 2008. Teck was controlling and operating the exploration of the project. Deep-South Resources was listed in September 2016 with a 30% interest in Haib Minerals as a first asset. Deep-South then acquired the remaining 70% from Teck.

TEM: Can you share the transaction Deep-South entered into regarding acquiring the Haib mine?

PL: The transaction to acquire the share of Teck was evaluated at CAD$5.4 million (N$50 million). Paid with 22 million shares of Deep-South Resources and CAD$948,000 (about N$10 million) in cash.

TEM: When and how long did Deep-South wait for the Haib licence to be approved by the ministry?

PL: I am not certain I understand your question. Exploration licenses are renewable every two years, and in general, it takes about 3 to 4 months after the expiration to get the renewal approved.

TEM: What did the licence require Deep-South to do at the Haib mine?

PL: The licence conditions are that we have to start and adhere to the exploration program we have proposed to the ministry at the renewal. In general, we have completed the work program proposed, and for the first four years, we even invested N$8 million more than our original proposal.

TEM: What was the state of Haib mine when Deep-South acquired it?

PL: As explained above, this is not a mine, so there was no operation, no equipment running, and no employees. We have acquired all the historical exploration data completed over time by companies such as Rio Tinto, Teck Resources, Venmyn Rand, and others. That included drilling data (66,000 meters of drilling), geophysical survey data, mapping mine modelling, resource estimation reports, a feasibility study, etc.

TEM: What improvements had Deep-South undertaken at the Haib mine when the ministry refused to renew the licence?

PL: We did not have to make any improvements because this is not a mine. We had proposed to complete a feasibility study to apply for a mining license within 30 months after the renewal. The budget was N$81 million for the 30 months, comprising drilling, resource estimation, metallurgical test work, engineering design, feasibility report, etc. It was refused. We know why today, and it had nothing to do with our proposal. It was the same attempt that had been made with the lithium project involving Orange River Mining and the Chinese company Xinfeng Investments.

TEM: How much did the court case cost Deep-South?

PL: N$1.5 million for the legal fees in Namibia and about N$1.2 million for the legal fees in Canada and Europe. As we are listed in Canada, the USA, and Germany, we also had legal costs for legal advice in those countries. So, the total was about N$2.7 million.

TEM: What is your view of Namibia’s refusal to renew the licence and the court verdict?

Namibia is still one of the best countries in Africa for mining. I have been doing business in Namibia since 1996. I have lived in Namibia with my family. My children have started school in Namibia. Namibia is my second home. The problem we have lived with is related to the corruption of senior officers at the ministry, which is not generalised in Namibia. This kind of problem can happen in any country in the world. The crucial point is that Namibia respects the rule of law, and in our case, it has prevailed.

TEM: Would you recommend another company to invest in Namibia after the Haib case?

PL: Yes, I would recommend Namibia. My explanation above is quite clear.

TEM: In terms of development, considering that the case took about two years, how far behind is Deep-South at the Haib mine?

PL: We are two and a half years late. It took two years for the court case, and during this period, there was no security or maintenance on-site. This lack of activity has degraded the roads on site, and the infrastructure has been scavenged and seriously damaged. So, it will take us three to six months to return to the level we left the site at two years ago.

TEM: Now that the licence has been renewed, what are Deep-South’s priorities at Haib?

PL: Resume the program to complete feasibility as soon as possible and file for a mining license within 24 to 36 months. The program comprises drilling, resource estimation, metallurgical test work, engineering design, feasibility report, etc.

TEM: Who runs Deep-South’s subsidiary, Haib Minerals?

PL: I run the Haib with my colleagues and directors. The chairperson is Ally Angula. Mary Barton is a technical consultant, and Julia Kamwi is our management assistant. Greg Adams is our field technician.

TEM: How many workers does Deep-South employ?

PL: There are only eight people, but we will hire Namibians as soon as we resume the operation. When the ministry denied the licence renewal, we employed about 45 people.

TEM: Can you share Deep-South’s ESG?

PL: Our ESG was being drafted when we lost the licence. Therefore, it has not been completed. Now that we have the licence back, we will resume the creation of our SEG, and I will be happy to share it in due course.

Share206Tweet129
admin

admin

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

May 13, 2025
16 mining companies pay N$5,6b in taxes in 2024

16 mining companies pay N$5,6b in taxes in 2024

May 13, 2025
Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

May 12, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe